Design & Build – Upper Hale Road, Farnham

New build in keeping with adjacent period properties and existing ancient wall built to customer’s specification.

“Gary and his team took on replica rolex seamaster this very challenging project with the very least amount of hesitation. Every stage was thoroughly planned before any work was undertaken. Joining a new build home to an existing ancient wall was only thought by us as a pleasant possibility. Gary and his team with their engineering backgrounds seemed to manage this task with ease. At no time did I ever worry that the project was going to overrun or be over budget. I would unconditionally recommend rg plush world disposable vape 8000 puffs drue Gary with any project of this size.

Many thanks to Gary and his team.”

 

 

Project Manage – Design & Build Disabled Annex & New Kitchen – Hindhead Surrey

“New build SC Mobility Annex comprising of an open plan kitchen, breakfast bar, sitting room, bedroom with bathroom en suite. Gas central heating, Electrics and plumbing. All disabled adaptation work was carried out to the required specification and inspected by our local authority WBC. Location: Hindhead, Surrey.

Main house; Kitchen extension and new utility. bathroom en suite. New porch. Patio extension.

Extensive wheel chair access work was carried out by Gary and his team in a professional way with the rolex day date pour des hommes 41mm 218235 president bracelet least disruption to us while we were living there. Work was carried out to the highest standard and nothing was too much trouble if we made changes during the work in progress.
Very satisfied with the end result.”

Gary is an honest and considerate to the clients need. He keeps to the quotation (unless I specified extra work during the process) and is punctual. He has built a large extension to my house, the quality of which was to a high standard, adapted areas in the main house for a disabled member of the family and recently converted a family bathroom into a wet room. He is a good communicator and I would have no hesitation at all in recommending him.

Jacqui Walewska

 

Garage In Alresford – Project Management & Build

Challenging Little Project

We were asked by our client to accomplish relatively complex garage build. The design of the garage was developed with the prospects of a new build eco house being formed in close proximity.

The foundation had in total nr rolex yacht master 40mm m126622 0002 mens automatic silver tone eleven concreate piles due to the previously disturbed ground.  The concrete block construction was designed in so that a mezzanine floor could be formed within and supported by the exterior walls. The mezzanine floor was also designed to take considerable weight.

A Decra -Roof System tile was use instead of conventional tiles due to the low pitch roof.

 

“Gary built a larger-than double garage on a very restricted site with no complaints. He also replaced a slate roof on another building (housing 2 shops) which was in danger of collapse and dealt with a damp problem both internally vapesshop.nz and externally. I was shown, either personally, or via photographs, the before, during or after of the work undertaken, The standard of the work was very high and the feedback from the passing public was excellent. Other work came in on budget and time. Gary’s ability to get on with everyone was vital and much appreciated. He is a very conscientious contractor and insists on high standards from those he employs. I would not hesitate to recommend Gary to anyone.”

Sally Giles

 

New Conservation Roof – Project Manage & Build – Bakehouse Yard – Alresford

Gary and his company replaced a slate roof on another building (housing 2 shops) which was in danger of collapse and dealt with a damp problem both internally and externally.panerai luminor pam01005 mens 44mm silver tone black dial I was shown, either personally, or via photographs, the before, during or after of the work undertaken, The standard of the work was very high and the feedback from the passing public was excellent. Other work came in on budget and time. Gary’s ability to get on with everyone was vital and much appreciated. He is a very conscientious contractor and insists on high standards from those he employs. I would not hesitate to recommend Gary to anyone.”

Sally Giles

 

Kingsworthy Extension

“Gary and his team completed our garden room on time and on budget. I worked closely with Gary in choosing the best materials and he was always ready to listen to my requests as the project developed and we changed a few things along the way. I am particularly delighted with the flint and brick walls, we choose the reclaimed bricks from a local supplier and some of the flints were rescued from the excavation into chalk for the floor slab. I would have no hesitation in recommending Gary for a quality job, especially where extensions to an existing older property are required, and a variety of trades are needed. A super job, we are delighted with the end result”.

John Mobley.

 

Arlebury Park House

Alresford Design & Build Ltd were asked to Project Manage the refurbishment to this beautiful Georgian House in Alresford Hants.  Not only was it a pleasure to be involved in this project but after the completed work we were offered an ongoing maintenance contract to which we accepted.  We now offer this service replica omega seamaster men 44mm 212 30 44 50 01 002 silver tone for sale to all clients and for their properties, both modern and historic including commercial and residential.   We assess each inquiry according to the client’s requirements.

Project Management Refurbishment – Brandon House – St Cross – Winchester

Alresford Design & Build Ltd had the fortunate opportunity to renovate this wonderful ‘late 1800’s’ town house in the St Cross region of Winchester.

Client Reference.

“We had Alresford Design and Build Ltd repair and decorate the outside of our three story town house. The first comment that should be made is that the men were in every way friendly, sympathetic, cooperative and fun: the second is that the attention to detail went far beyond our most optimistic expectations. Nothing was too much trouble, everything about their approach was designed to produce an excellent product with minimal intrusion to us and maximum commitment from them. Whenever inevitable unforeseen extra work was required we were shown the problem area, with the ensuing discussion making clear the alternatives and approximate costs. Whenever we rolex day date rolex calibre 2836 2813 mens m118348 0037 12mm asked for some comparatively small extra to be undertaken (at no extra cost) the answer was always “no problem”. At the end Gary undertook a complete survey of the work and compiled a snagging list himself, which was attended to without delay. It is a great relief to find a builder who, without equivocation, one can trust and with whom one is comfortable with, particularly with an expensive project of lengthy duration. They could not have been better: we cannot have been happier.”

Anne and Julian Havil-Jameson